Its construction was approved in 2002 but the work started
Vital Statistics
Length 1.315 km
No of spans 17
Arch span 467 mts (linear)
359 mts above the river bed level
Cost of bridge Rs.1,486 cr
Design life 120 years
Maximum speed 100 kmph
Max wind speed 266 kmph
Total steel 28,660 tons
My take
What an achievement! The union territory of J&K is developing at a brisk pace!! Three cheers to PM Modi and his team!!!
Tailpiece.
Got up at a half past 5, let Lekha sleep for another half an hour as she had desired. Opened up the house for the day.
A quiet Sunday.
No comments:
Post a Comment